Friday, January 16, 2009

Zeb Atlas & Mark Dalton

What can be insulated later? Why

masonry
The insulation measure is feasible in the short term and usually without scaffolding and construction site equipment. Consuming and expensive preliminary work on the buildings are not necessary. Either or mold-injection holes in the Cross joints of the walls or drilled stones taken from the walls. This can also be difficult to reach areas of the cavity layer and filled evenly. After Dämmvorgang the holes grouted or easily removed stones will be reinstated.



roof and ceiling
During the subsequent one ceiling insulation boards are 2-3 down from the attic removed from the Fußbodendielung. Then, the insulating material is introduced into the compartments. After Dämmvorgang If the removed planks reinstated



ventilation and pipe shafts
existing supply wells may later be filled with granular Rockwool. The non-combustible stone wool with a melting point> 1000 ° C according to DIN 4102 can prevent the fire spreading to other floors in the utility shaft.



vaulted ceilings and domes
The problems of classical insulation with sheets or webs include vaulted ceilings in churches, halls and curved ceilings of older buildings. For these sectors in the German Rockwool Sprühklebetechnik for the blow-in insulation system has developed. With this technique, the insulation even in designs with a slope werden.quelle applied slip-up to 80%, evenly and seamlessly: trotherm.de


0 comments:

Post a Comment